Instant Download of Documents and Procedures for the Australian Building and Construction Industry to assist Developers, Builders, Tradespeople and Owner Builders.
Plastering Safe Work Method Statement – SWMS inclusions:
Site Establishment
Pre Start Risk Assessment
Setting up the work area
Unloading materials plant and equipment
Stacking materials
Setting out
Steel wall framing
Installing insulation
Fixing plasterboard and fibre cement wall sheet
Set out and install suspended ceiling grid and furring channel
Plasterboard
Fibre cement sheets
Wall Sheeting
Ceiling sheeting
Ceiling tiles
Setting joints
Sanding joints
Clean up
Using Stilts
Working at heights, mobile scaffold and EWP
Exposure to weather conditions
Tools, plant and equipment
Power supply
Manual handling
Deliveries and the like
House Keeping with Silica Dust, respirable crystalline silica (RCS)
High Risk Activities
PPE required
Plant and Equipment
Qualifications, Training & Competencies
Permits required
Legislation, Codes Of Practice and References
Safety Data Sheets (SDS)
Risk Matrix Table
Hierarchy of Control
Instructions provided
Job steps
Hazard identification
Control Measures
Breaks the work activity into logical job steps
Lists the typical hazards associated with each of these steps
Describes the control measures implemented to eliminate or control the risk for the workers safety
Describes how the control measures are to be implemented, monitored and reviewed
MS Word Format
Easy to update and customise using MS Word. Add your logo, colours and details to suit your unique business needs.
Instant Download
Your instant download is provided immediately upon purchase and is also delivered via Email.
Plastering SWMS
The Plastering Safe Work Method Statement breaks the tasks down into logical job steps, lists the typical hazards associated with each of these job steps, and describes the control measures implemented to eliminate or control the risk for the workers safety.
This “Accident Incident Investigation Register” is used to maintain a record of all accident or incident investigations undertaken on site, following an accident or incident investigation using the “Accident Incident Investigation Record“.
FEATURES:
Instant Download
User friendly, easy to use template
MS Word formatted template for easy editing
Simply add your details
Scroll down ↓ to the “Product Description” below for document information.
This Mobile Crane Pre-Start Checklist has been developed to identify mobile crane related risks on construction sites and to assist in managing those risks minimizing workplace injuries complying with Work Health and Safety legislation.
FEATURES:
• Instant Download
• User friendly, easy to use templates
• MS Word formatted templates for easy editing
• Simply add your details.